DE Logo

OPTI-VISOR™

Product Image
OPTI-VISOR Iso FrontUP
OPTI-VISOR Front

  • Summary
  • Applications

    Energy optimisation of HVAC chilled-water plants with partial or all variable speed equipment and an existing building automation system (BAS) or central plant controller.

  • Description

    The Armstrong OPTI-VISOR interfaces seamlessly with any existing building automation to maximise overall plant efficiency – without replacing or reconfiguring existing componentry. The OPTI-VISOR harmonises the interplay of existing componentry through leading-edge control algorithms for maximum plant performance.

  • MaterialsEnclosure, electronic circuitry, software
  • Configuration

    Integrates with all brands of chillers, pumps, and building automation systems

  • Performance Range
    No limitations in plant size and cooling capacity 
  • PowerNo limitations in plant size and cooling capacity
Lowest installed cost
  • Fast and easy installation directly to chiller plant equipment
  • Software-based commissioning
Lowest operating cost
  • Optimum plant control for up to 30% higher energy efficiency (over a variable primary system) and fast project payback
  • Lower evaporative cooling for 5%+ in water savings
  • ECO*Pulse™ HVAC health management (including predictive maintenance) for reduced plant failure and downtime (free first-year subscription)
  • Intuitive user interface for expedient operator training and simplified, safer plant operation

Lowest environmental cost
  • Optimum plant performance for up to 30% higher energy efficiency over a variable primary system
  • Optimum plant performance for up to 30% lower carbon (greenhouse gas) emissions (avoided electricity generation)

Genuine Armstrong Parts Kits

All the parts you need to keep your systems running perfectly.
»
Lowest project risk
  • ECO*Pulse™ HVAC health management (includes predictive maintenance) for reduced plant failure and downtime (free first-year subscription)
  • More stable supply of chilled water (compared to traditional systems) for reduced temperature swings and increased occupant comfort
  • No replacement of existing plant componentry for easy installation and full BAS operability (in the unlikely event of communication issues between OPTI-VISOR and BAS)
  • Smoother equipment operation for extended cooling system lifetime