YOU NEED RESOURCES FOR PROGRAMS

WE'LL HELP YOU CUT BUILDING COSTS

Government

The need for building space, the requirements of building occupants and the challenge of maintaining existing building stock can create real challenges, especially when there’s pressure to reduce budget deficits. When you need solutions to reduce your operating costs and get the most benefit from existing budgets, Armstrong can help you find efficiencies and reduce installed costs.

In most instances Armstrong solutions offer the lowest first cost and the lowest lifecycle cost available.

Our product solutions and packaged systems are the most efficient currently on the market. Most of the retrofit projects using Armstrong solutions reduce energy standing by 35% – 45% over the previously installed equipment and cover the initial project costs within 3 years.

Featured
case study

Sector:
Government
Location:
United Kingdom
Lancashire Constabulary
Results:
    Armstrong designed and constructed four packaged plant rooms based around the MBS integrated heating system to replace an outdated oil-fired boiler house.
    The retrofit project has reduced the energy costs for the Hutton Hall site by £245,000 per year, and saved over 740 tonnes of CO2 emissions per year.
Caret RightDownload case study (PDF)

Genuine Armstrong Parts Kits

All the parts you need to keep your systems running perfectly.

Find a Part Kit

resources & tools

More Tools

We have a suite of free online support materials and tools. Find the essentials to learn, apply, and maintain Armstrong equipment.

Get started

Contact Us

Contact us

We are happy to help. Discuss your project and product needs with us, check the status of your shipments, or let us save the day in an emergency.

Get in touch